Unbonded Generator | OCPD and GFCI Device Function
This video shows the use of an unbonded generator in an application where the question is posed, will the GFCI Device function, or wi...
Transformer Series Part 6 – Grounding & Bonding
Join Paul as he walks you through the grounding and bonding requirements for Transformers. Be sure to watch the other parts of this s...
Transformer Series Part 5 – Secondary Conductor Rules (C)(3) through (C)(6)
Join Paul Abernathy as he talks about the various secondary conductor rules (C)(3) through (C)(6) for transformers. Please be sure to...
Transformer Series Part 4 – 10′ Secondary Conductors Rules
Join Paul Abernathy as he continues the transformer series and talks about the rare (C)(1) secondary conductor rule as well as the 10...
Transformer Series Part 3 – Conductor Sizing & 240.21(B)(3) Tap Rules
Join Paul Abernathy as he takes you through part 3 of the transformer series on how to size primary and secondary conductors to trans...
Transformer Series Part 2 – Calculating the Primary and Secondary Overcurrent Protection
Introduction to Transformers and the National Electrical Code® in 2017 NEC. This is a multi-part series on understanding transformers...
Transformer Series Part 1- Calculating Primary & Secondary Current Ratings
Introduction to Transformers and the National Electrical Code® based on the 2017 NEC. This is a multi-part series on understanding tr...
4-17-2024 | Dwelling Unit 8 Questions and Answers
Recorded session on Unit 8 and Single family Dwelling Load Calculations questions answered for students from 4/17/2024 Live Session.
#1 Hot Tub Installation Code Violations | NEC 2023 Critique
Dive into our detailed critique of a popular video that discusses code violations associated with hot tub installations. Using the 20...