Dwelling Units | General Use Receptacle Outlet Placement
Watch as Paul Abernathy, CEO of Electrical Code Academy, Inc. and founder of the Fast Trax® Program and CMECP® Program explains the g...
2023 National Electrical Code | 210.70 Lighting Outlets
Watch as Paul Abernathy talks about the requirements in the 2023 NEC 210.70 (A) for dwelling unit lighting outlet requirements. You c...
Load Calculations and the pesky Largest Motor at an 25%
In this video, we dive deep into how the Fast Trax Electrical Exam Prep System makes sizing grounded/neutral conductors a breeze! Whe...
When to use Standard Method vs Optional Method
When doing a single family dwelling calculation, how do you know when to use the Optional method (Part IV) over the standard method (...
2023 NEC | Working Space Clearance 110.26(A)(1) to (A)(4)
This video is on working clearance requirements for electrical equipment that will likely be energized while servicing, maintenance,...
Feeder and Branch Circuit Bonding | 250.96
This video provides an understanding to the importance of bonding for feeders and branch circuits on the load side of the service dis...
Transformer Series Part 6 – Grounding & Bonding
Join Paul as he walks you through the grounding and bonding requirements for Transformers. Be sure to watch the other parts of this s...
Transformer Series Part 5 – Secondary Conductor Rules (C)(3) through (C)(6)
Join Paul Abernathy as he talks about the various secondary conductor rules (C)(3) through (C)(6) for transformers. Please be sure to...
Transformer Series Part 4 – 10′ Secondary Conductors Rules
Join Paul Abernathy as he continues the transformer series and talks about the rare (C)(1) secondary conductor rule as well as the 10...
Transformer Series Part 3 – Conductor Sizing & 240.21(B)(3) Tap Rules
Join Paul Abernathy as he takes you through part 3 of the transformer series on how to size primary and secondary conductors to trans...